top of page

Song, Doo Hyup

Work for KEPCO E&C in Korea (December 1, 1982 ~ December 31, 2015)​

 

  • Participated in the EPC project of Osan Combined Heat Power Plant (436MW + 280 Gcal/h). (2013 ~ 2015)

  • Design works for the plant of mitigation of hydrogen sulfide gas using bacteria in landfill site of Korea capital area. (2011 ~ 2013)

  • Design works for Combined Cycle Power Plants, Combined Heat Power Plants, Fossil Power Plants, Integrated Gasification Combined Cycle Power Plant, Bio Mass Power Plants. (1994 ~ 2015)

  • Engaged in work concerned with the preparation of the small bore piping guidebook for Nuclear Power Plant Han Bit Unit No. 3,4 in Korea(1989 ~ 1990)

  • Performed a study of standard nuclear power plant pipe support standardization as a pipe support engineer. (1986 ~ 1987)

  • Pipe support design for the Korea Nuclear Power Plant  Kori Unit No. 3,4 & Han Bit Unit No. 1,2 as a structural engineer. (1982 ~ 1984)​

RESEARCH PAPERS​

 

  • “The study for wall thinning phenomenon of the secondary system of Nuclear Power Plants”, KEPCO E&C R&D REPORT 1990

  • “ The study of the vibration for non-uniform cross section beam”, Inha University , 1981