top of page

Kim, Yeon Jae

 

Work for following Korea EPC firm (July, 1980 ~ April, 2016)

  • GS Engineering & Construction Corp (2011~2016)

  • Hanwha Engineering & Construction Corp (2008- 2011)  

  • Korea District Heating Engineering Co. Ltd. (2005- 2008)            

  • TOYO Engineering Korea Ltd (2004- 2005)

  • SK Engineering & Construction Co., Ltd. (1990- 2003)

  • HYUNDAI Engineering Co., Ltd. (1982- 1990)

  • SAMSUNG Shipbuilding Co., Ltd. (1980- 1982)

 

PROFESSIONAL CAREER

  • Engineering Director for Basic and Detail Engineering of KAIS CCPP (2+2+1 x 2 Blocks) of Sonelgaz, Kais, Algeria; Gas Turbine: 217 MW x 4 units (GE 9FA.03); Steam Turbine: 243 MW x 2 units (GE) (February, 2014.2~ April, 2016);

  • Engineering Director for Basic and Detail Engineering of PP-12 CCPP (4+4+1 2 Blocks) of Saudi Electricity Company, Riyadh, Kingdom of Saudi Arabia; Gas Turbine: 170 MW x 8 units (GE 7FA); Steam Turbine 345 MW x 2 units (Alstom) (May, 2012~February, 2013)

  • Engineering Manager for Marafiq STG units 5 & 6 Project of Marafiq in Yanbu, Kingdom of Saudi Arabia; Steam Turbine: 275 MW x 2 units. (August, 2009- April, 2011)

  • Supervising Engineer for Kwang-Myung CES Plant of Samchully Co. Ltd., Korea; Gas Turbine: 17.3 MW x 2 units (Kawasaki L20A); Steam Turbine: 11.4 MW x 1 unit. (June, 2008~July, 2009)

  • Engineering Manager for Ma’aden PDP Project of Ma’aden Phosphate Company in Al-Khobar, Kingdom of Saudi Arabia; Steam Turbine: 75 MW x 2 units. (June, 2008.06~July,2009)

  • Project Manager for Basic Engineering of Sindorim D-Cube City CES Plant of DAESUNG COGEN, Korea; Gas Engine: 3 MW x 4 units. (January, 2008~June, 2008)

  • Project Manager for Basic and Detail Engineering of Daejeon Hakha CES Plant of Chungnam City Gas Co., Ltd., Korea; Gas Turbine: 15 MW x 2 units Steam Turbine: 7 MW x 1 unit. (December, 2007~June, 2008)

  • Project Manager for Basic Engineering of Homaesil CES Plant of HUCES Co., Ltd., Korea; Gas Turbine: 24 MW x 2 units; Steam Turbine 14 MW x 1 unit. (November, 2007~June, 2008)

  • Lead Mechanical Engineer for Basic Engineering of Gwangju Suwan Combined Heat & Power Plant of Suwan Energy Ltd., Korea; Gas Turbine: 45 MW x 2 units (Siemens SGT-800); Steam Turbine: 40 MW x 1 unit. (January, 2007~October, 2007)

  • Lead Mechanical Engineer for Basic Engineering of Pangyo Combined Heat & Power Plant of Korea District Heating Corporation, Korea; Gas Turbine: 120 MW x 1 unit (Siemens 501D5A); Steam Turbine: 39.3 MW x 1 unit. (September, 2005~December, 2006)

  • Responsible Mechanical Engineer for Supervision of Detail Engineering of Hwaseong Combined Heat & Power Plant of Korea District Heating Corporation, Korea; Gas Turbine; 190 MW x 2 units (Mitsubishi M501F); Steam Turbine: 197.9 MW x 1 unit (Mitsubishi) (July, 2005 ~ December, 2005)

  • Responsible Mechanical Engineer for Front End Engineering & Design of BPA and PC Plant of KAZANORGSINTEZ, Kazan, Republic of Tatarstan, Russia (02.17~05.28: Dispatched to Toyo Engineering Corp. in Japan for co-work). (February, 2005~June, 2005)

  • Responsible Mechanical Engineer for Basic and Detail Engineering of Photo Mask Plant for HOYA Electronics Korea Limited, Hyunkok, Korea. (November, 2004~February, 2005)

  • Lead System Engineer for Basic and Detail Engineering of Kwangyang Combined Cycle Power Plant of SK Power Co., Ltd., Kwangyang, Korea; Gas Turbine : 170 MW x 4 units (GE 7FA); Steam Turbine : 200.9 MW x 2 units (MHI)

  • Mechanical Supervising Engineer for Detail Engineering of Ilwon Total Energy Supply System, Seoul, Korea; Steam Turbine: 13.3 MW x 1 unit. (December, 1996~September, 1998)

  • Lead Mechanical Engineer for Basic and Detail Engineering of Mokdong MSW Incineration Plant, Seoul, Korea; Steam Turbine: 4.5 MW x 1 unit; Refuse Incinerator: 200 t/day x 2 units. (January, 1993~October, 1995)

  • Mechanical Responsible Engineer for Basic and Detail Engineering of Cibinong Cement Plant, Cibinong, Indonesia Capacity: Portland Cement 4,600 MTPD x 1 Line. (July, 1989~July, 1990)

  • Lead Mechanical Engineer for Basic and Detail Engineering Including Feasibility Study of Diesel Engine Co-Generation Plant for Hotel Intercontinental Seoul, Korea. (September, 1987~December, 1988)

  • Mechanical Responsible Engineer for Basic and Detail Engineering of Misurata Power and Desalination Plant, Misurata, Libya; Gas Turbine: 12 MW x 1 unit; Steam Turbine: 84.65 MW x 6 units. (December, 1982~December, 1986)

  • Mechanical Responsible Engineer for Basic and Detail Engineering of Cargo Handling System, Ventilation System, Anchor Handling/Mooring System and Steering System for various Cargo Ships. (July, 1980~November, 1982)

OVERSEAS WORK EXPERIENCE

  • Parsons Energy & Chemicals Group Inc., Reading, PA, U.S.A. Basic design for Kwangyang CCPP, Korea (February, 2002~June, 2002)

  • Toyo Engineering Corp., Chiba, Japan. FEED work for BPA and PC Plant of KAZANORGSINTEZ, Kazan, Republic of Tatarstan, Russia February, 2005~May, 2005)

  • The Kuljian Corporation, Philadelphia, PA, U.S.A. Basic and Detail engineering for Marafiq STG units 5 & 6 Project of Marafiq in Yanbu, Kingdom of Saudi Arabia. (September, 2009~April,2010)

  • IDOM, Bilbao, Spain. Basic Design for PP-12 CCPP, Riyadh, Kingdom of Saudi Arabia. (June, 2012~September, 2012)

  • TATA Consulting Engineers Ltd., Bangalore, India. Basic Engineering for KAIS CCPP, Kais, Algeria. (May, 2014~July, 2014)

© 2021 by Todo Juntos Group

bottom of page